Prefabricated and modular infrastructure delivered into terrain that made conventional construction impractical, including wastewater and medical facilities.

Capability
Construction & Engineering
Location
Remote operating site
Engagement
Design and build programme
Silhouetted site crew and tower cranes against a dusk sky
01The challenge

What we were handed

The client held a site that conventional construction could not reach economically. Heavy plant could not be sustained at the location, the delivery window was short, and the completed facilities had to include wastewater treatment and deployable medical support to Role 1 and Role 2 standards. Anything built there also had to be capable of being taken down and moved once the operational requirement changed.

02The solution

What we did about it

We designed the programme around prefabricated and modular construction so that the majority of the build happened away from the site and arrived ready to assemble. Infrastructure design covered dining facility operations and wastewater systems as an integrated utility rather than separate installations, and portable medical facilities were specified to the Role 1 and Role 2 requirement. The result is infrastructure that meets a permanent standard while retaining the portability the client asked for.

Approach

How the work was sequenced

  • Prefabricated and modular construction to minimise on-site plant and labour
  • Integrated design covering dining facility operations and wastewater systems
  • Portable medical facilities specified to Role 1 and Role 2 requirements
  • Camp establishment sequenced around access constraints and delivery windows
  • Structures specified for disassembly and relocation at end of requirement
03Outcomes

What changed as a result

01
Role 1 & 2
Medical support facilities delivered
02
Modular
Built for disassembly and relocation
03
Integrated
Dining and wastewater delivered as one system
04
Off-site
Majority of build completed away from the location
04Gallery

From the programme

  • Site engineer in high-visibility gear holding a tablet with cranes behind
    Plate 01Access and ground assessment ahead of the build programme
  • Bright modern industrial facility with exposed steel beams and skylights
    Plate 02Completed modular structure in service
  • Glass office towers photographed looking upward against a pale sky
    Plate 03Design and engineering coordination
05Start a conversation

Tell us what the operation actually requires

Send us the scope, the timeline and the constraint you think is the hardest. We will tell you honestly whether we are the right partner for it.

Office
Sylejman Vuçiterna, Hyrja 25, Kati VIII, Nr. 3, 10000 Prishtinë, Kosovo