Camp Management
Establishment and daily operation of a 600-person camp covering accommodation, dining, laundry and utilities under a single accountable contract.
- Capability
- Turn-Key Life Support
- Location
- Western Balkans
- Engagement
- Multi-year sustainment contract

What we were handed
A multinational client needed to house and sustain six hundred personnel on a site with no permanent accommodation, no potable water connection and no waste infrastructure. Occupancy was fixed by an operational date that could not move, and the existing arrangement split catering, cleaning, waste and maintenance across four separate suppliers who each escalated problems to the client rather than solving them between themselves.
What we did about it
Gashi Strategies took the entire life support scope under one contract. We surveyed the site, designed a camp layout around the terrain and access routes rather than a standard template, and installed modular accommodation selected for rapid build and later relocation. A dining facility was constructed and commissioned, potable water supply and wastewater treatment were established, and laundry, cleaning and portable sanitation were folded into the same operation with one point of contact for the client.
Approach
How the work was sequenced
- Site survey covering ground conditions, access routes and utility availability before any layout was drawn
- Modular accommodation specified for rapid installation and future relocation
- Dining facility built and commissioned to serve three meals daily at full occupancy
- Potable water supply, wastewater treatment and scheduled waste removal established on site
- Single management structure replacing four separate subcontracts
- Population-linked scaling so services flex with headcount rather than contract renewal dates
What changed as a result
- 600
- Personnel housed and sustained
- On date
- Camp handed over for occupancy as scheduled
- 4 to 1
- Suppliers consolidated into one accountable contract
- 3 meals
- Served daily at full occupancy without interruption
From the programme

Plate 01Modular units specified for rapid build and later relocation 
Plate 02Ground survey preceding camp layout design 
Plate 03Dining facility and utility infrastructure under construction
Tell us what the operation actually requires
Send us the scope, the timeline and the constraint you think is the hardest. We will tell you honestly whether we are the right partner for it.
- Telephone
- +383 49 540 747
- Office
- Sylejman Vuçiterna, Hyrja 25, Kati VIII, Nr. 3, 10000 Prishtinë, Kosovo